Insta-Valve 20-24 Eliminates Service Disruption to Connect Water to New Travel Center Continue Reading 2025-12-15 By: DBE Jeans On: December 15, 2025
Insta-Valve 250 Keeps Hospital’s Water On During Emergency Line Repair Continue Reading 2025-12-10 By: DBE Jeans On: December 10, 2025
Insta-Valve 250 Isolates Wastewater Digester Pumps When Previous Valves Failed Continue Reading 2025-12-05 By: DBE Jeans On: December 5, 2025
Insta-Valve 250 Eliminates Widespread Service Outage During Pipe Replacement Project Continue Reading 2025-12-01 By: DBE Jeans On: December 1, 2025
Insta-Valve 250 Reduces Shutdown Area for One of Largest Military Installations in the U.S. Continue Reading 2025-11-25 By: DBE Jeans On: November 25, 2025
Insta-Valve 250 Mitigates Large Service Outages in Residential Neighborhood Continue Reading 2025-11-20 By: DBE Jeans On: November 20, 2025
Insta-Valve 20-24 Provides New Control Points Without Disrupting Service to Hospital Continue Reading 2025-11-15 By: James Edwards james On: November 15, 2025
Insta-Valve 250 Provides Added Control to Prevent Service Disruptions to Senior Care Center Continue Reading 2025-11-10 By: James Edwards james On: November 10, 2025
No Shutdowns, No Setbacks: The Smart Valve Strategy Behind Englewood’s Water Upgrade Continue Reading 2025-11-05 By: James Edwards james On: November 5, 2025
Preserving Pressure, Protecting Service: Upgrading Hydrant Infrastructure in Kent County Continue Reading 2025-11-01 By: James Edwards james On: November 1, 2025