The Insta-Valve 20-24 provided a targeted shutdown to expand and connect the water supply to a new travel facility.
City Avoids Full Shutdown of Wastewater Facility for Repairs with Valve Insertion
The Insta-Valve 20-24 provided a targeted shutdown to remove and replace inoperable valves without substantial shutdown.
Insta-Valve 20-24 Isolates Potentially Dangerous Leak Under Railroad Tracks
Download Project Brief Northwestern Indiana — Hydra-Stop’s solution stopped a potentially dangerous leak without disrupting service to nearby factories or businesses. On New Year’s Eve a leak was discovered within an
Hydra-Stop’s Insta-Valve 20-24 Delivers Performance Under Pressure
Download Project Brief Large City in North Carolina — Hydra-Stop’s solution kept the water running in a highly active and populated area while repairs were made. During a pipe and
Insta-Valve 20-24 Provides Needed Control for Infrastructure Expansion
Download Project Brief Buckeye, AZ — Hydra-Stop’s solution allowed targeted control to connect a million-gallon water tank to a new water treatment center. The City of Buckeye is a steadily