Santa Clara, CA — The Insta-Valve 250 provided targeted shutdown without impacting service to customers.
Insta-Valve 250 Provides Targeted Control Without System Shutdown
Download Project Brief Hartford, CT and Surrounding Area — Hydra-Stop’s solution allowed targeted control for planned maintenance and repair. MDC is a water utility that serves a densely populated region
Insta-Valve 20-24 Isolates Potentially Dangerous Leak Under Railroad Tracks
Download Project Brief Northwestern Indiana — Hydra-Stop’s solution stopped a potentially dangerous leak without disrupting service to nearby factories or businesses. On New Year’s Eve a leak was discovered within an
The Insta-Valve 250 Puts a Stop to a Month-Long Water Loss of 150 GPM
Download Project Brief Steubenville, Ohio — Hydra-Stop’s solution allowed a targeted shutdown to stop a massive and costly water loss. A 12-inch valve in the downtown area of Steubenville was
The Insta-Valve 250 Minimizes Disruption During an Emergency
Download Project Brief Miamisburg, OH - Hydra-Stop’s solution allowed greater control that minimized shutdown when a water main ruptured. Like so many municipalities, the City of Miamisburg has an aging
Hydra-Stop’s Insta-Valve 20-24 Delivers Performance Under Pressure
Download Project Brief Large City in North Carolina — Hydra-Stop’s solution kept the water running in a highly active and populated area while repairs were made. During a pipe and
Installation of Insta-Valve 250 Ensures 128-Bed Hospital Remains Operational
Download Project Brief Northern New Jersey - The Insta-Valve 250 provided targeted shutdown to allow proactive maintenance while ensuring a nearby hospital remained fully operational. As part of a proactive